Yet another building work update

As you can probably tell, not much is happening here apart from normal work and building work.
The renovation is slowly moving forward, we had a bit of a setback this week as we discovered the upstairs neighbour's water is coming into our flat through what looks like a broken pipe in our ceiling/their floor - so inside the building structure.. Hmmpf. More on that as it develops I guess. But that meant we had to even take some of the new wall that we've put up out. On the upside at least it didn't happen after it had all been plastered and painted. But it does also mean we can't really work too much on the wall frames we need to get up for the new bathroom which is slightly frustrating.

We've still managed to get up some more plasterboard and insulation making the place very warm to work in, especially given that it's been quite warm here to start. And luckily for me Ross has had help carrying all the plasterboards up the 4 flights of stairs from Brice, Ben and Lindo.
Some more materials have been ordered as well to arrive hopefully over the next week or so; workshop style door and interior window and some more light switches and door handles to complete our first order as it was all now back in stock.





Comments

Popular posts from this blog

Couloir des pisteurs

Covered in insulation dust

2nd Anniversary